Builders · Remodelers · Property managers

Plan the connected home
before the walls close.

One coordinated technology scope for lighting, motorized shades, surveillance, access control, and enterprise-grade networks.

01 / Planning

Start with the drawings.

Share floor plans, construction milestones, and the owner’s priorities. We coordinate control locations, shade power, rack space, equipment ventilation, and low-voltage routes.

02 / Pre-drywall

Coordinate the rough-in.

We establish responsibilities with your builder and electrician, document cabling and device locations, and inspect the technology rough-in before finishes limit access.

03 / Completion

Deliver a usable system.

Installation, commissioning, integrated testing, labeled cabling, and a guided owner walkthrough connect the design to everyday use. Support and warranty terms are documented in the agreement.

Existing property or phased remodel?

We survey access and infrastructure first, then propose a practical sequence that fits occupied spaces and renovation stages.

Government & commercial contracting ↗